E&I for Refinery-wide Turn Around
Detroit, MI
Marathon Petroleum Corporation
Marathon Petroleum Corporation
4 months
2012
Over $5 Million
Responsible to Install, Trouble Shoot, and Commission all East Plant E&I. This includes, but is not limited to, the following systems: Crude/Vac, Existing DHT, GOHT, Alky, SWS, New DHT, ICP, and OSBL units/processes. This was the largest Turn Around ever for Detroit Refinery.
Over 700 Instruments Installed/Serviced
Over 200 Instrument Specification Checks
Over 1,000 Loop Checks Verified
Over 2,000 Instrument Quality Inspections Completed
Detroit, MI
Marathon Petroleum Corporation
Marathon Petroleum Corporation
4 months
2012
Over $5 Million
Responsible to Install, Trouble Shoot, and Commission all East Plant E&I. This includes, but is not limited to, the following systems: Crude/Vac, Existing DHT, GOHT, Alky, SWS, New DHT, ICP, and OSBL units/processes. This was the largest Turn Around ever for Detroit Refinery.
Over 700 Instruments Installed/Serviced
Over 200 Instrument Specification Checks
Over 1,000 Loop Checks Verified
Over 2,000 Instrument Quality Inspections Completed